|
Timber
(planks, plywood, spruce beams, etc.) is no longer required.
Materials are no longer worn out.
Nails, clamps and column clamps are no longer used.
Construction cost is reduced by up to 70%.
Specialized workers required are reduced by up to 70%.
Project implementation time is reduced by up to 50%.
Top quality steel QSTE 460 TM SEW 092.
Raw material is ISO 9002 certified.
|
|